Notifications
You must be signed in to change notification settings - Fork 0
/
Copy pathcost_optimisation_main.m
149 lines (132 loc) · 6.05 KB
/
cost_optimisation_main.m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
% Approximate runtime: 30 minutes
% This function performs the optimisation process to minimise process cost.
% To run, simply key in 'cost_optimisation_main' in the command window.
%% Expected Results:
% 5 years = [4.74146229918933,2.78935179056159,5.57870358112163,4.21763300131390,0.228230508256410]
% Total Cost for 5 years excl feed material cost = [7126813.29352452]
% Total Annualised Cost = [16500867.6080469]
%% Main Code Starts Below
XGuess = [5 2.5 6.2 5 0.23];
A = []; B = []; Aeq = []; Beq = []; LB = [4 2 4 3 0.2]; UB = [];
options = optimoptions('fmincon','Algorithm','sqp');
output = fmincon(@(X)costobj(X),XGuess,A,B,Aeq,Beq,LB,UB,@nonlcon,options);
TotCost = costobj(output); %Optimised Cost, Excluding Hydrogen Feed Cost
%Cost of Feed
QG = output(4);
PricePerKgUSD = 4.50; %(NREL, 2009)
MoleFlowH2 = QG*101325/(8.314*(313.15));
MassFlowH2 = MoleFlowH2/2000;
AnnualH2Cost = 1.4*PricePerKgUSD*MassFlowH2*3600*8000;
ProcessWaterCost = 184431.542; % Calculated Separately
TotalAnnualisedCost = TotCost/5 + AnnualH2Cost + ProcessWaterCost;
function TotCost = costobj(X)
PAtm = X(1); D = X(2); L = X(3); QG = X(4); QL = X(5);
TCel = 40;
%% Calculation of Operating Costs
OperationYears = 5; %Years of Assumed Operation
% Energy Required for Compression
QGinlet = QG*1.01325/2.6;
QGoutlet = QG/PAtm;
if (QGinlet-QGoutlet)>0
CompressorPowerOut = CompressorPowerRequired(QGinlet,PAtm); %Interpolated from HYSYS
else
CompressorPowerOut = 0;
end
MWhCost = 94.3; %5-year Average Cost of electricity (Wholesale, USEP) per MWh, Singapore
kWhCost = MWhCost/1000; %Cost of electricity per kWh, Singapore
Efficiency = 0.85; %Assume Pump Efficiency
CompressorPowerIn = CompressorPowerOut./Efficiency;
% Energy Required for Pumping Feed
ExchangerPdrop = (10/14.7);
PumpPowerOut = QL*101325*(PAtm+ExchangerPdrop-(1.2/1.01325)); %Units in Watts, Isothermal Assumption
PumpPowerIn = PumpPowerOut./Efficiency;
% Energy Required for Pumping Product
ProductPumpOut = QL*101325*(4-2.5); %Units in Watts, Isothermal Assumption
ProductPumpIn = ProductPumpOut./Efficiency;
% Hourly Cost of Compression and Pumping
HourlyCost = kWhCost*(CompressorPowerIn + PumpPowerIn + ProductPumpIn)/1000;
%% Calculation of Capital Costs
% Cost of Reaction Vessel
S = 17100; %MAWP (stress), units in PSI
Ppsig = PAtm.*14.6959 - 14.6959; %Operating pressure in psig
Pd = exp(0.60608+0.91615.*(log(Ppsig))) + 0.0015655.*((log(Ppsig)).^2); %Design Pressure, psig
Di = D./0.3048; %Internal Reactor Diameter in feet
Lft = L./0.3048; %Reactor Length in feet
Lft = Lft*1.2; %Add 20% to account for column internals
E = 1; %fractional weld efficiency
tp = Pd.*Di.*12./(2.*S.*E-1.2.*Pd); %Pre-adjusted shell wall thickness
tw = 0.22.*(Di.*12+18).*((Lft.*12).^2)./(S.*(Di.^2)); %additional thickness for wind, as vertical vessel
tv = 0.5.*tw+tp; %Thickness after adjusting for wind protection
tc = 0.125; %corrosion allowance
ts = tc + tv; %Final shell thickness
rho = 503.8; %in lb/ft3
W = pi.*(Di+ts./12).*(Lft+0.8.*Di).*(ts./12).*rho;
MatCostUSD = 1.64.*W; %US$1.64 per kg of 316 Steel
% Cost of Internals (3 x Sieve Trays for Liquid Redistribution)
CEPCI_2019 = 610.5;
CEPCI_2010 = 532.9;
CostPerTray2010 = 130 + 440*(D^1.8);
TotalInternalsCostUSD = 3*(CEPCI_2019/CEPCI_2010)*CostPerTray2010;
% Cost of Compressor (Centrifugal)
CompressorkW = CompressorPowerOut/1000;
CompressorCost2010 = 580000 + 20000*(CompressorkW^0.6); % From Towler
CompressorCostUSD = (CEPCI_2019/CEPCI_2010)*CompressorCost2010;
% Cost of Pump (Centrifugal) - 2 required
FlowRateLitres = QL*1000;
FlowPerPump = FlowRateLitres/2;
CostPerPump2010 = 8000 + 240*(FlowPerPump^0.9); % From Towler
TotalPumpCostUSD = 2*(CEPCI_2019/CEPCI_2010)*CostPerPump2010; % Cost of 2 pumps
% Cost of Heat Exchanger
hT = 1000; %Heat transfer coefficient, (W/m2K) from Smith, 2005
LiquidMoleFlow = QL*LiquidConcentration(TCel); %in mol/s
TempRiseRequired = 10; %Temperature rise required, in K
HeatCapL = LiquidHeatCapacity(TCel); %Liquid Heat Capacity, in J/mol.K
HeatTransferRequired = LiquidMoleFlow*HeatCapL*TempRiseRequired; %Units in Watts
LMTD = 25; %Log mean temperature difference
HeatExchangerArea = HeatTransferRequired/(LMTD*hT);
ExchangerCost2010 = 28000 + 54*(HeatExchangerArea^1.2); % From Towler
ExchangerCostUSD = (CEPCI_2019/CEPCI_2010)*ExchangerCost2010;
% Cost of Catalyst
CostPerKgUSD = 90; %Cost per kg
CatalystCost = (650.*(pi.*(D.^2)./4).*L).*CostPerKgUSD; %Assume US$58/kg
CapCost = 1.4.*(MatCostUSD+CatalystCost+CompressorCostUSD+TotalPumpCostUSD+TotalInternalsCostUSD+ExchangerCostUSD);
OpCost = HourlyCost.*8000*OperationYears;
TotCost = CapCost+OpCost;
end
function [c, ceq] = nonlcon(X)
PAtm = X(1);
D = X(2);
L = X(3);
QG = X(4);
QL = X(5);
[EAQH2MoleFlow,Pdrop,HydrogenationRate,ErrorFlag] = helper_reactorsimulation(PAtm,D,L,QG,QL);
QGmin = (182.1*8.314*(50+273.15))/(101325*PAtm);
c = [-(HydrogenationRate-182.1); -(PAtm-Pdrop-1); -(L/D-2); QGmin-QG; ErrorFlag;abs(EAQH2MoleFlow)-0.001];
ceq = [];
end
function CompressorPowerOut = CompressorPowerRequired(QGinlet,PAtm)
% This function calculates the compressor power required per m3/s of flow,
% for an inlet pressure of 2.6 bar
% CompressorPowerOut in Watts
% mole flow basis = 371.4 kgmol/hr per 1m3/s of flow at 2.6 Bar, 30C
Power = [0 48.96 145.1 225.3 356.5 510.0 594.8 704.8 857.4]*1000;
Pressure = [2.5660 3 4 5 7 10 12 15 20];
PowerPerM3 = spline(Pressure,Power,PAtm);
CompressorPowerOut = PowerPerM3*QGinlet;
end
% Liquid Heat Capacity (Assume 30% Quinones, 35% p-Xylene, 35% Methanol)
function HeatCapL = LiquidHeatCapacity(TCel)
HeatCap = [0.22731 0.23183 0.23651 0.24117 0.24576 0.25054 0.25514 0.25980 0.26450 0.26920 0.27380].*1000; %Units in J/molK
TA = [20 30 40 50 60 70 80 90 100 110 120];
% Since this is a straight line, a linear fit will suffice.
p = polyfit(TA,HeatCap,1);
HeatCapL = p(1)*TCel + p(2);
end
% Liquid Concentration (Assume 30% Quinones, 35% p-Xylene, 35% Methanol)
function CL = LiquidConcentration(TCel)
CLA = [6943 6888 6831 6774 6717 6658 6599 6539 6477 6415 6352];
TA = [20 30 40 50 60 70 80 90 100 110 120];
% Since this is a straight line, a linear fit will suffice.
p = polyfit(TA,CLA,1);
CL = p(1)*TCel + p(2);
end