If HfLA volunteers don't work full time, and don't operate on sprints, what exactly are thepts: #labels used for? Is requiring its usage all that helpful for us?
While we're at it, why is therole: __label required? Does it mean that it's assigned to the research or design team? What if the task has nothing to do with UXR or UXD?
reacted with thumbs up emoji reacted with thumbs down emoji reacted with laugh emoji reacted with hooray emoji reacted with confused emoji reacted with heart emoji reacted with rocket emoji reacted with eyes emoji
-
In Agile/scrum, story points are for "expressing an estimate of the overall effort required to fully implement a product backlog item or any other piece of work." However, story points are meant to be used in the context of a M-F 9-5 developer team working in sprint cycles. And 1 point is meant to represent 1 full work day.
If HfLA volunteers don't work full time, and don't operate on sprints, what exactly are the
pts: #
labels used for? Is requiring its usage all that helpful for us?While we're at it, why is the
role: __
label required? Does it mean that it's assigned to the research or design team? What if the task has nothing to do with UXR or UXD?Beta Was this translation helpful? Give feedback.
All reactions