You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
if needed: any Commission meeting or hearing that is scheduled during the sprint - None scheduled in 17.2
If needed: any change in status doc that may happen
Post any other banners that might be needed:
Post EFO maintenance banner for 2/4. Banner should go live 5:30 pm on 2/4 and stay up through 10 am on 2/5. Just update the one in the Wagtail banners section with these dates and times.
Create banner ticket for 17.3 and add it to PI planning doc for Content PI17
EFO outage banner 2/1
The text was updated successfully, but these errors were encountered:
Summary
What we are after:
Content team is going to have routine sprint ticket for banner work each sprint to make sure we're on top of it.
Related
Banner spreadsheet
Banner How to
Completion criteria
Banners set up for:
Post any other banners that might be needed:
Post EFO maintenance banner for 2/4. Banner should go live 5:30 pm on 2/4 and stay up through 10 am on 2/5. Just update the one in the Wagtail banners section with these dates and times.
Create banner ticket for 17.3 and add it to PI planning doc for Content PI17
EFO outage banner 2/1
The text was updated successfully, but these errors were encountered: