Skip to content

Minor improvements #514

Minor improvements

Minor improvements #514

Triggered via push December 15, 2023 22:56
Status Failure
Total duration 4m 25s
Artifacts

build.yml

on: push
Matrix: build
Matrix: build-other
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

14 errors
test (ubuntu-latest, 1.74.0)
Process completed with exit code 101.
test (ubuntu-latest, stable)
The job was canceled because "ubuntu-latest_1_74_0" failed.
test (ubuntu-latest, stable)
The operation was canceled.
test (ubuntu-latest, beta)
The job was canceled because "ubuntu-latest_1_74_0" failed.
test (ubuntu-latest, beta)
The operation was canceled.
test (ubuntu-latest, nightly)
The operation was canceled.
test (windows-latest, nightly)
The operation was canceled.
test (macos-latest, 1.74.0)
The operation was canceled.
test (windows-latest, 1.74.0)
The operation was canceled.
test (macos-latest, stable)
The operation was canceled.
test (windows-latest, stable)
The operation was canceled.
test (windows-latest, beta)
The operation was canceled.
test (macos-latest, nightly)
The operation was canceled.
test (macos-latest, beta)
The operation was canceled.