You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
❌ TestRunIncrementalBuildRoutine (10m24.24s)
incremental_build_test.go:55:
Timed out after 300.000s.
Expected
<string>: kind-registry:5000/test-0c69be85-3121-48a6-9228-5e055a1f5b24/camel-k-kit-cou7vd3ia7ns738hnbl0@sha256:ef37351cef1b88365a6c1e9399fa028d03a763ade86ff06d609068552bd5697e
to equal
<string>: eclipse-temurin:17
### Camel K version
_No response_
The text was updated successfully, but these errors were encountered:
Similar of #5332 - all these parallel builds are suffering some problem lately. I suppose it could be the enabled parallelism introduced in tests are showing possible concurrency problem in the build process.
As you're tracking these kind of failures as well, please, link the action so it is easier to follow it up and get the log dump for a more clear analysis. Thanks!
What happened?
The
TestRunIncrementalBuildRoutine
sometimes fails with no clear explanationSteps to reproduce
Seen latest time in https://github.com/apache/camel-k/actions/runs/9008778242/job/24765909747?pr=5480
Relevant log output
The text was updated successfully, but these errors were encountered: