Skip to content

move the storage preparation responsibility #132

move the storage preparation responsibility

move the storage preparation responsibility #132

Triggered via push April 25, 2024 14:29
Status Failure
Total duration 2m 40s
Artifacts

ci.yml

on: push
Matrix: Functional Tests
Matrix: Tests
Matrix: Upgrade Status
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Tests (10.1, entity_to_text)
Process completed with exit code 1.
Tests (10.2, entity_to_text)
The job was canceled because "_10_1_entity_to_text" failed.
Tests (10.2, entity_to_text)
The operation was canceled.
Tests (10.0, entity_to_text)
The job was canceled because "_10_1_entity_to_text" failed.
Tests (10.0, entity_to_text)
The operation was canceled.
Tests (9.5, entity_to_text)
The job was canceled because "_10_1_entity_to_text" failed.
Tests (9.5, entity_to_text)
The operation was canceled.