missing classes for the tasks module #1968
Labels
[A] new term
Including new term(s) in the ontology
meta issue
Issue that collects information about topics and will be closed after detailled issues are solved.
oeo dev meeting
Discuss issue at oeo dev meeting
To do
Issues that haven't got discussed yet
Milestone
Description of the issue
The tasks module was added due to #1891 with definitions provided by the domain expert. Some of the concepts in these definitions are absent in the OEO. I made a list of every concept I found more or less worth adding and propose a definition - though some of those definitions definitely could be improved. Some of the concepts may not be relevant enough to add, I put these in the bottom.
Ideas of solution
I would find most important to add:
wind characteristics
is already a separate issue (Addition for or of wind characteristics #1965)levelized cost of energy
as an alternative label forlevelized cost of electricity
(which is already in the oeo) since both are well used.Capital expenditures
(CAPEX) are costs for physical assets (eg. and, equipment) including things like acquisition and maintenance. The asset has to have a useful life of more than on year.It is calculated as (prior period Property, Plant and Equipment) - (current period Property, Plant and Equipment) + (current Depreciation).
Ongoing operational expenditures
(OPEX) are costs for day-to-day operations (e.g. rent, wages) of a company not including whatever value is actually produced by said company.capacity factor
andCF
as alternative labels fornet capacity factor.
To me these seem to be the same concept at least.wind power density
(WPD) is a quantity vale of the power wind has in a specific area.It is calculated as 0.5 * air density * (wind speed to the power of 3)
multi-criteria decision analysis
(MCDA) is a methodology to help with decision making by defining goals, priorities and weights.I would find these less important but maybe still useful:
economic potential
is the potential for economic development.(we already have
economic stock potential
andeconomic flow potential
in the oeo)geographical potential
is the potential given by the physical location.wake loss
is a loss in power output of turbines that occur due to speed reduction of wind that already passed another turbine.(Currently we don't have losses in the oeo but is has been discussed in Losses of Energy Transfer #1823. Maybe that could be revived)
exclusion zone
is a two-dimensional spatial region in which specific activities are forbidden.buffer zone
is a two-dimensional spatial region meant to keep opposing parties spatially apart.interest rate
is an economic value that shows how much interest is added to a value per time period.operating cost
is a cost that is given due to operating a thing day-to-day.maintenance cost
is a cost given by maintaining a thing so it stays operational.Workflow checklist
I am aware that
The text was updated successfully, but these errors were encountered: