diff --git a/src/ontology/edits/oeo-tasks.omn b/src/ontology/edits/oeo-tasks.omn index 66de20944..a5f84e5a1 100644 --- a/src/ontology/edits/oeo-tasks.omn +++ b/src/ontology/edits/oeo-tasks.omn @@ -568,7 +568,7 @@ Class: OEO_00390053 OEO_00020426 "Add; issue: https://github.com/OpenEnergyPlatform/ontology/issues/1891 pull request: https://github.com/OpenEnergyPlatform/ontology/pull/1940", - "Calculate Levelized Cost of Energy is an action specification that describes the computation of the Levelized Cost of Energy (LCOE) either for individual turbines or for sub-regions within the study area by applying a cost model based on the previously calculated economic parameters and the capacity factors.", + "Calculate levelised cost of electricity is an action specification that describes the computation of the levelised cost of electricity (LCOE) either for individual turbines or for sub-regions within the study area by applying a cost model based on the previously calculated economic parameters and the capacity factors.", rdfs:label "calculate levelised cost of electricity"@en SubClassOf: