You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
It would be best if there is only one place the beamline staff need to update for the beamcenter. It looks like GDA uses lookup tables where the beamcenter position in relation to the detector distance is updated. This value is in mm so the plan should also do the conversion to pixels (the pixel sizes for both detectors are known).
This way we can use the same lookup tables as GDA does and the beamline staff only needs to update things in one place.
noemifrisina
changed the title
I24 serial: have a plan to set the beam center
I24 serial: set the beam center using lookup tables
Nov 15, 2024
Set up a plan that the beamline staff can use from the command line to update the beam center values at the beginning of each run.
The text was updated successfully, but these errors were encountered: